检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:黄海锋 李准[1] 谭盛凛 陆冬生[1] 王剑涛[1] 张永辉[1] HUANG Haifeng;LI Zhun;TAN Shenglin;LU Dongsheng;WANG Jiantao;ZHANG Yonghui(PowerChina Beijing Engineering Corporation Limited, Beijing 100024, China)
出 处:《水力发电》2019年第6期41-45,103,共6页Water Power
摘 要:大华桥水电站在可研、招标详图阶段开展了大量的设计优化工作,取得了良好的社会效益和经济效益,如厂房厂址选择、泄洪建筑物布置、调压室面积确定、料源选择、围堰堰型选择、边坡开挖支护、大坝建基面抬高、进水口布置等,有效降低了施工难度、加快了施工进度,节省了工程投资,充分体现了动态设计的理念,有利于开拓设计视野,创新设计思路,提高设计水平。Dahuaqiao Hydropower Station has carried out a large number of design optimization in the stages of feasibility study and bidding detailed drawing respectively such as powerhouse site selection, flood discharge structure layout, surge chamber area determination, material source selection, cofferdam type selection, slope excavation supporting, dam foundation elevation run-up and intake layout. The design optimization can effectively reduce construction difficulty, speed up construction progress and save investment, which has achieved good social and economic benefits. The design optimization process fully reflects the concept of dynamic design, which is conducive to open up design vision, innovate design ideas and improve design quality.
分 类 号:TV222[水利工程—水工结构工程] TV274
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3