检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李静 Li Jing
机构地区:[1]华蓝设计(集团)有限公司
出 处:《城市道桥与防洪》2019年第6期272-275,283,M0027,M0028,共7页Urban Roads Bridges & Flood Control
摘 要:建筑工业化是我国建筑行业的一次“产业革命”,预制装配式综合管廊是其中的重要组成部分。目前南宁市预制装配式综合管廊存在断面标准不统一、生产规模小、成本高,不利于形成产业化等一系列问题。基于模数协调的原则,提出适应当地预制装配式综合管廊建设的标准化断面及其组合形式,为该地区其他类似工程提供了有益的借鉴和参考。The building industrialization is an "industrial revolution" in the building industry of China. The prefabricated utility tunnel is an important component in it. At present, there are a series of problems such as the section standard disunity, small production scale and high cost not conductive to industrialization in the prefabricated utility tunnel of Nanning City. Based on the principle of modular coordination, this paper puts forward the standardized section and its combining form suitable for the construction of local prefabricated utility tunnel, which provides the reference for the other similar projects in this region.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.12.102.192