检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:郭旭 GUO Xu(Fujian Tongli Architectural Design Institute,Sanming 366000)
机构地区:[1]福建同力建筑设计院有限公司,福建三明366000
出 处:《福建建筑》2019年第6期45-49,共5页Fujian Architecture & Construction
摘 要:人工挖孔桩在我国现有设计施工技术条件下仍是重要的桩基类型之一,但近年来人工挖孔桩护壁破坏造成塌孔的施工事故时有发生,护壁厚度不足可能是造成塌孔的主要原因之一。文章分析了传统人工挖孔桩护壁厚度设计时土压力取值、护壁厚度计算模型、材料设计强度取值三方面存在的问题,提出了切实有效的圆形挖孔桩护壁厚度设计计算方法。The artificial digging pile is still one of the important types of pile foundation under the existing design and construction technology conditions in China.However,in recent years,the collapse accidents caused by the destruction of the retaining wall of Manual Excavated Piles often occur,and the insufficient thickness of the retaining wall may be one of the main reasons for the collapse of the retaining wall This paper analyzes the problems of soil pressure value,wall thickness calculation model and material design strength value when designing traditional artificial digging pile retaining wall thickness,and effective calculation method for wall thickness design is proposed.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249