检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李江华 肖仕进 LI Jianghua;XIAO Shijin(Engineering Safety Monitory Center, Survey and Design Institute,Sinohydro Bureau 10 Co.,LTD, Dujiangyan, Sichuan, 610072)
机构地区:[1]中国水利水电第十工程局有限公司勘测设计院工程安全监测中心
出 处:《四川水力发电》2019年第3期78-80,83,共4页Sichuan Hydropower
摘 要:混凝土面板堆石坝是以堆石体为支承结构,在其上游表面浇筑钢筋混凝土面板作为防渗结构的堆石坝。堆石坝的沉降变形关系到大坝的安全,是判定大坝运行状况的重要指标。为了解决混凝土面板堆石(砂砾石)坝面板下部的电磁沉降管在面板施工时被废弃的问题,本文介绍了一种成工的电磁沉降管弯管施工工艺。通过对该工艺的运用,南湃水电站电磁沉降管成活率高,同时节约了大量的经济成本。CFRD is a rockfill dam with rockfill body as supporting structure and reinforced concrete face slab as impervious structure on its upstream surface. The settlement and deformation of rockfill dam is related to the safety of the dam, which is an important index to determine the operation status of the dam. In order to solve the problem of destroying the electromagnetic settlement pipe in the lower part of concrete face rockfill (gravel) dam during the construction of face slab, this paper introduces a successful construction technology of electromagnetic settlement pipe bending. By applying of this technology, the survival rate of the electromagnetic settlement pipe of Nam Phay Hydropower Station becomes higher, and much economic costs are saved.
分 类 号:TV641.43[水利工程—水利水电工程] TU196.2[建筑科学—建筑理论]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117