百色水利枢纽汛末蓄水分析  被引量:1

Analysis of reservoir water storage at the end of flood season for Baise Multipurpose Dam Project

在线阅读下载全文

作  者:叶飞武 蒋华波[1] YE Fei-wu;JIANG Hua-bo(Guangxi Water and Power Design Institute, Nanning 530023, China)

机构地区:[1]广西水利电力勘测设计研究院

出  处:《广西水利水电》2019年第3期41-43,共3页Guangxi Water Resources & Hydropower Engineering

摘  要:结合右江流域汛末来水预报,选择相似典型年,提出考虑来水预报下的百色水利枢纽汛末蓄水方案,研究抬高汛末水库蓄水位的可能性,并分析蓄水方案的风险与效益,为百色水利枢纽充分利用水资源提供参考。For Baise Multipurpose Dam Project, combined with the Youjiang River basin inflow forecast at the end of flood season, similar typical years were chosen to study the possibility of raising the reservoir water level, put forward the reservoir water storage scheme at the end of flood season taking into account inflow forecast, analyze the risk and benefits of water storage scheme, so as to provide reference for fully utilization of water resources.

关 键 词:汛末 来水预报 蓄水方案 风险与效益 百色水利枢纽 

分 类 号:P333[天文地球—水文科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象