检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:梁冠亭 刘敏[3] 李明豪 LIANG Guanting;LIU Min;LI Minghao(Wuhan Municipal Construction Group Co.,Ltd.,Wuhan 430056,China;School of Civil Engineering,Wuhan University,Wuhan 430072,China;School of Civil Engineering,Harbin Institute of Technology,Harbin 150090,China)
机构地区:[1]武汉市市政建设集团有限公司,湖北武汉430056 [2]武汉大学土木建筑工程学院,湖北武汉430072 [3]哈尔滨工业大学土木工程学院,黑龙江哈尔滨150090
出 处:《自然灾害学报》2019年第3期79-86,共8页Journal of Natural Disasters
基 金:国家自然科学基金面上项目(51678198);十三五重点研发计划(2016YFC0701102);湖北省交通运输科技项目计划(2016600207)~~
摘 要:论文运用通用有限元软件ANSYS对香溪长江大桥-大跨度拱桥进行了数值模拟。以COMBIN37单元模拟非线性粘滞阻尼器,分析了该阻尼器布置于拱肋横梁与主梁处(方案1)及安装在立柱与主梁之间(方案2)两种不同位置时对拱桥的地震响应控制效果。分析结果表明:针对顺桥向位移反应,方案1的控制效果明显优于方案2;两种阻尼器控制方案均对桥面加速度有放大作用,且方案1的放大效果要比方案2大。两种阻尼器控制方案对拱顶及拱脚轴力均有较好的控制效果,且方案1的控制效果优于方案2;两种阻尼器控制方案对拱桥面内弯矩的控制效果,方案2的控制效果优于方案1。上述研究结果为大跨度拱桥振动控制分析及工程应用具有重要的指导意义。In the present paper, numerical analysis of Xiangxi Yangtze River Arch Bridge with long-span is carried out by using the commercial finite element software ANSYS. Nonlinear viscous damper modeled with COMBIN37 element was simulated. The control efficacy of the arch bridge installed with nonlinear viscous dampers was analyzed when the viscous dampers were arranged on the site of the rib beam and the main beam (Scheme 1), and between the column and the main beam (Scheme 2), respectively. The numerical analysis results show that the control efficacy of scheme 1 is obviously better than that of scheme 2 on the mitigation of the displacement response of the bridge deck. However, both of two schemes could enlarge the acceleration response of the bridge deck. Moreover, the negative effect of scheme 1 is greater than that of scheme 2. In addition, both of two schemes could decrease the force of the vault and spring of main arch, and the scheme 2 have the better control efficacy on the force of the vault and spring of main arch. For the in-plane bending moment, the control efficacy of scheme 2 is superior to that of scheme 1. These investigations provide important guidance for the vibration control analysis and engineering application of long-span arch bridges.
关 键 词:大跨度拱桥 有限元 非线性粘滞阻尼器 抗震性能 振动控制
分 类 号:T393.3[一般工业技术] X9[环境科学与工程—安全科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.12.123.254