检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张振扬 周江阔 郝生雷 任振群[1] 朱吉胜[1] ZHANG Zhen-yang;ZHOU Jiang-kuo;HAO Sheng-lei;REN Zhen-qun;ZHU Ji-sheng(Jining No.3 Coal Mine, Yankuang Group, Jining 272100, China)
机构地区:[1]兖矿集团济宁三号煤矿
出 处:《煤炭技术》2019年第6期63-64,共2页Coal Technology
摘 要:立交巷道布置是矿井巷道掘进常用方法,合理的应力分析及支护设计是立交巷道施工的关键。以济宁三号煤矿立交巷道为背景,运用FLAC3D数值模拟软件对立交巷道围岩应力分布情况进行分析,提出合理的立交巷道支护设计方案,确保矿井安全生产。Interchange of roadway is a common method of mine roadway tunneling,reasonable stress analysis and support design are the key to the construction interchange of roadway. Based on the intersection of Jining No.3 coal mine, the stress distribution of surrounding rock was analyzed by using FLAC3Dnumerical simulation software, put forward a reasonable support design for the roadway and ensure mine safety production.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28