检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:黄府 HUANG Fu(Nantong COSCO Heavy Industry Co., Ltd, Nantong Jiangsu 226004,China)
机构地区:[1]南通中远重工有限公司
出 处:《机械研究与应用》2019年第3期119-120,126,共3页Mechanical Research & Application
摘 要:分析特大型龙门吊提升的工艺及影响因素;基于主梁的结构形式与特点,对主梁提升过程中受力集中区域进行结构设计;采用ANSYSWorkbench软件建立有限元模型,添加约束与多工况载荷,进行强度计算,并对计算结果进行分析;并对设计方案进行优化,为主梁提升的结构设计提供依据。In this paper, the hoisting process and influencing factors of oversize gantry crane are analyzed.Based on the structural form and characteristics of the main girder, structural design for the stress concentration area of the main girder in lifting process is carried out.The finite element model is established by using the ANSYS Workbench software;constraints and multiple working conditions are added to calculate the strength, and the calculation results are analyzed.The design scheme is then optimized so as to provide a basis for design of the girder lifting structure.
关 键 词:龙门吊 主梁 结构设计 有限元 ANSYSWORKBENCH
分 类 号:TH213.5[机械工程—机械制造及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249