检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈振芳 CHEN Zhenfang(Pangpangta Coal Mine,Huozhou Coal and Electric Power Group Corporation Limited,Linxian 033200 ,China)
机构地区:[1]霍州煤电集团有限责任公司庞庞塔煤矿,山西临县033200
出 处:《煤矿现代化》2019年第4期50-52,共3页Coal Mine Modernization
摘 要:针对煤层底板存在奥灰承压水影响工作面安全回采问题,采用理论分析和数值计算对动压影响下底板破坏深度进行了计算,同时计算了底板承受极限水压力,通过突水危险性评价,可知该工作面在回采过程中易发生突水事故。基于此提出了底板注浆加固方案,使底板抵抗突水的能力得到加强,从而实现工作面安全高效回采。In view of the existence of the coal seam floor under the influence of Ordovician pressure water on safety mining, theoretical analysis and numerical calculation are used to calculate the damage depth of floor slab under the influence of dynamic pressure, at the same time calculating the ultimate water pressure of the bottom plate, through the risk assessment of water inrush, it is known that the coal face is prone to water inrush accident during the mining process. Based on this, the slab grouting reinforcement scheme is proposed to strengthen the floor resistance to water inrush, so as to realize safe and efficient mining.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222