检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:丁学武 杨永康[2] Ding Xuewu;Yang Yongkang(Hainan Province Construction Group Corporation Limited Haikou 570204,China;Hainan Nonn-Ferrous Engineering Investigation and Design Institute Haikou 570206,China)
机构地区:[1]海南省建设集团有限公司,海口570204 [2]海南有色工程勘察设计院,海口570206
出 处:《广东土木与建筑》2019年第7期43-46,共4页Guangdong Architecture Civil Engineering
摘 要:结合某度假村项目酒店地基处理工程,设定了地基处理目标,采用了强夯法+CFG桩复合地基进行分区处理,探讨了地基处理设计方案。通过点夯夯沉量观测、地表平均沉降量观测、工后沉降观测、标准贯入试验、重型动力触探试验、平板载荷试验分析,表明强夯法+CFG桩复合地基处理厚层松散砂土地基具有良好效果,可供该区域类似工程参考。Based on the ground treatment of a hotel project in Sanya,the goal of ground treatment is set,the dynamic consolidation+CFG pile composite foundation is adopted,and the design is discussed by ground treatment.Through the data analysis of tamping settlement monitoring,surface settlement monitoring,post-construction settlement monitoring,standard penetration test,heavy dynamic probe test and plate loading test,the results show that thick loose sand ground by dynamic consolidation+CFG pile composite foundation has good effect,which provides reference for similar projects in Haitang Bay.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.151