检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘东升[1] LIU Dong -sheng
机构地区:[1]辽宁省白石水库管理局
出 处:《东北水利水电》2019年第7期14-15,37,72,共4页Water Resources & Hydropower of Northeast China
摘 要:在拱坝的坝身开设大表孔可以有效解决泄洪和取水问题,是拱坝设计的常见形式。文中以官山水库的拱坝为例,利用ANSYS三维有限元软件建立数学模型,对未开设表孔、开设宽浅型大型表孔和开设窄深型大型表孔进行对比分析。结论显示,在两种最不利工况下拱坝开设大表孔情况下,最大位移位置有所变化,位移量有一定增大,但总体上对坝体位移的分布规律影响较小,而宽浅型和窄深型大表孔对坝体位移产生的影响之间也不存在显著区别。The construction of large surface holes in the dam body of arch dams can effectively solve the problems of flood discharge and water intake, and is a common form of arch dam design. Taking the arch dam of the Guanshan reservoir as an example, the mathematical model is built by using the ANSYS three-dimensional finite element software to compare and analysis the no surface hole, the wide and shallow type large surface hole and the narrow and deep type large surface hole. The results show that, under the two most unfavorable conditions, the maximum displacement position has some change and the displacement has a certain increase for the arch dam with the large surface holes, but on the whole it has little influence on the distribution law of the dam displacement, and there is no significant difference for the dam body displacement between the wide and shallow type and the narrow and deep type large surface holes.
分 类 号:TV642.42[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.206