检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:黄定波 郑吉斯 郑程遥 HUANG Ding-bo;ZHENG Ji-si;ZHENG Cheng-yao(Guangzhou Energy Technology Co. , Ltd. , Guangzhou 510665, China)
机构地区:[1]广州市恩莱吉能源科技有限公司,广东广州510655
出 处:《水电能源科学》2019年第7期126-128,共3页Water Resources and Power
摘 要:针对传统的水电站水能计算与机组选型往往取决于经验、计算结果有时偏差较大的问题,提出了水能设计的动态模拟法,即将电站的水文过程、机组特性和调度控制作为一个整体,根据实时工况的效率计算实时发电量,以多年平均发电量最大为目标函数,求取最优的机组参数,从而确定机组型号,并将该方法应用于塘头水电站中,取得了较好的效果。Aiming at the problem that the traditional hydro-energy calculation and unit selection often depend on the experience and the calculation results sometimes appear great deviation, a dynamic simulation method for hydro-energy design is proposed. This method takes hydrological process, unit characteristics and dispatch control as a whole, and calculates real-time power generation according to the efficiency of real-time working conditions. Taking the maximum average power generation for many years as the objective function, the optimal unit parameters are calculated so as to determine the unit type. This method has been applied to Tangtou Hydropower Station and achieved good results.
分 类 号:TV72[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28