云峰大坝坝顶表面修补处理方案的优化及实施  

Optimization and implementation of reinforcement scheme for Yunfeng dam crest

在线阅读下载全文

作  者:宋岩 耿凡坤 颜景枫 SONG Yan;GENG Fan-kun;YAN Jing-feng(Yunfeng Power Plant)

机构地区:[1]云峰发电厂,吉林集安134200 [2]新疆水利水电科学研究院,新疆维吾尔自治区乌鲁木齐830049

出  处:《大坝与安全》2019年第2期65-68,共4页Dam & Safety

摘  要:云峰大坝是由朝鲜设计并施工的宽缝重力坝,于1958年动工,1965年蓄水。大坝坝顶因原施工方法、工艺、质量等存在诸多问题,坝面产生严重的冻融、剥蚀,造成坝面渗水严重、大坝空腔水位升高,可能影响大坝坝体防渗性能。文章着重简述本次坝顶表面修补处理方案的优化及实施,为今后类似工程提供借鉴。Yunfeng dam is a wide-joint gravity dam designed and constructed by North Korea. The construction began in 1958 and water impoundment was in 1965. Due to poor construction method and quality, there are lots of problems of dam crest, which causes severe freezing and thawing, surface erosion,water seepage on dam surface as well as a rise of water level of dam cavity, affecting the dam safety and stability. The paper introduces the optimization and implementation of reinforcement scheme of dam crest, for reference.

关 键 词:坝顶渗漏 补强加固 云峰大坝 

分 类 号:TV698.2[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象