综放采场沿空区段巷道底板冲击地压防治及工程实践  被引量:1

Prevention and engineering practice of rock burst in roadway floor along goaf in fully mechanized top coal caving face

在线阅读下载全文

作  者:高晓彬 GAO Xiaobin(Shanxi xishan JinXing energy co.,LTD Xiegou Mine,Shanxi Xingxian 033602)

机构地区:[1]山西西山晋兴能源有限责任公司斜沟煤矿

出  处:《煤矿现代化》2019年第5期62-64,共3页Coal Mine Modernization

摘  要:在有明显冲击地压可能性的综放采场一般采用沿空留巷的巷道布置方式,但由于冲击地压的存在,沿空留巷存在底板冲击危险性。常规的卸压方法具有工程量大、工序繁琐的问题,且防治冲击地压效果不明显。本文通过研究沿空区段巷道底板冲击地压的影响因素及卸压方法,针对性地提出防治措施,从根本上降低防冲难度,为同类工程实践提供参考。in the fully mechanized caving mining field with the possibility of striking the ground pressure,the roadway arrangement way along the gob is generally adopted,but because of the existence of the rockburst,there is the risk of the floor impact in the roadway along the space.The conventional pressure relief method has the problems of large engineering volume and complicated process,and the effect of preventing and controlling rock burst is not obvious.In this paper,through the study of the impact factors of the floor impact pressure of the floor of the roadway along the empty section,the prevention and control measures are put forward to reduce the difficulty of the impact and provide reference for the practice of the same kind of engineering.

关 键 词:综放采场 沿空巷道 应力监测:底板冲击地压 

分 类 号:TD324[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象