作 者:刘国申 梁祖军 LIU Guoshen;LIANG Zujun(Pingmei Shenma Jiangong Group Jianjing No.3 Burean,Pingdingshan 467000,China)
机构地区:[1]平煤神马建工集团有限公司建井三处
出 处:《建井技术》2019年第1期8-10,4,共4页Mine Construction Technology
摘 要:平煤股份十矿北二进风井设计井深1119.572m,净直径8.0m,采用“四大一深”机械化配套凿井设备和工艺施工(即大井架、大提升机、大抓岩机、大吊桶和液压伞形钻架深孔爆破),短段掘砌混合作业,取得了最高月进尺达156m的好成绩,实现了快速施工。The design depth of the north No.2 ventilating shaft of the No.10 Coal Mine of Pingdingshan Tianan Coal Mining Co.,Ltd. was1119.572 m and the net diameter was 8.0 m.The “Four large,one deep” of mechanized shaft sinking equipments and technology (i.e.,large headgear,large hoister,large grab loader,large bucket and deep hole blasting by hydraulic umbrella boring frame) were adopted in the construction,and the mixed operation of short section excavation and lining was used.It achieved the highest monthly footage of156 m,and achieved rapid construction.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222