作 者:李慧 Li Hui(Shanxi Wuhuan Group Co.t Ltd.,Taiyuan,030013,Shanxi)
机构地区:[1]山西五建集团有限公司
出 处:《建设科技》2019年第14期68-73,共6页Construction Science and Technology
摘 要:某煤场封闭采用双层三心柱面钢结构网壳,跨度大,结构复杂,焊接量大。通过BIM技术的模拟施工对比分析,采用高空分块起吊拼装法施工,较传统的满堂脚手架施工法,避免了大量的脚手架搭设、加快了施工进度、降低了施工成本;较整体吊装法,降低了对场地的要求和安全的风险。A coal field is enclosed by double-layer three-core cylindrical steel structure mesh shell with large span,complex structure and large welding capacity.Through the comparative analysis of the simulation construction by BIM technology,the high-altitude block lifting and assembling method is adopted to construct the scaffolding,which avoids a large number of scaffolding erection,accelerates the construction schedule and reduces the construction cost,and decreases the site requirements and safety risks compared with the traditional hoisting method.
分 类 号:TU758.11[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229