检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:许延冰 XU Yanbing(China Railway SIYUAN Survey and Design Group Co.,Ltd WuHan 430063)
出 处:《铁道勘测与设计》2019年第3期41-44,共4页Railway Survey and Design
摘 要:结合金义东市域轨道交通工程与国铁换乘车站的设计方案,通过论述不同建设时序、不同预留条件下换乘方案的比选及优化过程,总结得出换乘设计应结合工程实际合理布置站位,并通过切实可行的方法优化换乘节点及换乘流线、尽量缩短换乘距离并降低换乘高差。According to the transfer design of Jinyidong urban transit railway and national railway,through discussing the comparison and optimization process of transfer schemes under different construction time sequence and different reservation conditions,it is concluded that the transfer design should reasonably arrange the station location in accordance with the actual project, and optimize the transfer nodes and transfer lines through practical methods, shorten the transfer distance as far as possible and reduce the transfer height difference.
分 类 号:U231.4[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222