市政涉铁工程中接触网改造设计分析  

The Reconstruction Design Analysis of the the Existing OCS—system in Municipal Related Projects

在线阅读下载全文

作  者:马鸿娇 MA Hongjiao(SIYUAN- Guangzhou Design Co. Ltd Guangzhou 510000)

机构地区:[1]中铁四院集团广州设计院有限公司

出  处:《铁道勘测与设计》2019年第3期89-92,共4页Railway Survey and Design

摘  要:通过上跨或下穿营业电气化铁路的市政涉铁工程中接触网改造设计案例的分析,阐述了由于通过营业电气化铁路区间、站场的上跨市政桥梁净空不够高,下穿市政涵洞位置无法避开接触网设备等原因,分析接触网改造的重、难点,并提出相应的接触网改造设计方案,达到尽量减小营业电气化铁路停电影响范围、减少接触网改造工程量[1]的目的。The paper expounds that the key and difficult points of the ocs-system reconstruction are analyzed, and the corresponding plan about the ocs-system reconstruction design is put forward to achieve the goal of minimizing the influence scope of power failure on business electrified railways and reducing the amount of business line reconstruction,for the reasons that the headroom of the municipal bridge over the electrified railway sections and stations is not high enough,and the position of the municipal culvert under the electrified railway sections and stations cannot avoid the catenary equipment, through the analysis of the ocs-system reconstruction design case in municipal related projects of overpassing or underpassing commercial electrified railways.

关 键 词:营业电气化铁路 接触网改造设计 上跨 下穿 

分 类 号:U225.42[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象