检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:袁越 YUAN Yue(China Railway SIYUAN Survey and Design Group Co.,Ltd WuHan 430063)
出 处:《铁道勘测与设计》2019年第4期38-40,共3页Railway Survey and Design
摘 要:2018年7月1日起,自然资源部要求全面使用2000国家大地坐标系。而由于历史原因,铁路系统采用的基础测绘成果仍有部分是基于西安80坐标系或北京54坐标系。如何快速将现有测绘成果转换到CGCS2000坐标系是当前亟待解决的问题。基于此,本文介绍了一套支持多数据类型、多转换模型和多转换方案的坐标转换软件,在过渡时期提供坐标转换支撑。Since July 1,2018,the Ministry of Natural Resources requires the full use of the CGCS2000.Due to historical reasons,the basic mapping results adopted by the railway system are still based on the Xi'an 80 coordinate system or Beijing 54 coordinate system.How to quickly convert existing mapping results to CGCS2000 is an urgent problem to be solved.Based on this, this paper introduces a coordinate transformation software that supports multiple data types, multiple transformation models and multiple conversion schemes, providing coordinate transformation support during the transition period.
关 键 词:CGCS2000 坐标转换 西安80坐标系 转换模型
分 类 号:P226.3[天文地球—大地测量学与测量工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229