检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张煜铖[1] ZHANG Yu-cheng(Xi'an Branch,Beijing Huayu Engineering Co.,Ltd.,China Coal Technology Engineering Group,Xi'an 710000,China)
出 处:《煤炭技术》2019年第7期65-67,共3页Coal Technology
摘 要:针对公乌素煤矿三号井在实际开采过程中存在开拓系统复杂、采掘失调、工作面搬家频繁、运输系统环节多、井下工作人员人数多、开采经济效益差等问题,根据矿井已有的井巷布置,当前成熟的煤层开采设备和井下运输设备的技术特点,从井田开拓、井下巷道布置、采区参数和工作面设备4个方面提出了公乌素煤矿三号井的开拓、开采优化方案.During the mining of Gongwusu 3th mine,many problems such as mining development complex,the disorder of mining and excavation,working face moving minig frequently,too many joints in transporting system,too many working people underground,less economies,etc.have emerged.According the current layout of shaft and drifts,the mature mining and transporting equipments,the improvement plan has been proposed from four aspects:the development of mining,the layout of shafts and drifts,the improvement of district charactercs and the upgrade of working face equipments.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28