水泥粉喷桩加固吹填淤泥地基现场试验研究  被引量:2

Pile foundation reinforcement field study of hydraulic fill mud

在线阅读下载全文

作  者:李云华 Li Yunhua(CNOOC Huizhou Petrochemical Co.,Ltd.,Huizhou 516086,China)

机构地区:[1]中海油惠州石化有限公司

出  处:《山西建筑》2019年第12期75-76,共2页Shanxi Architecture

摘  要:以某沿海石化区吹填淤泥地基加固为背景,在原有地基处理的基础上,进行了间距为1. 2 m和0. 9 m两种正方形布置、水泥掺量分别为12%和18%共4种组合的粉喷桩试验研究,分析了单桩竖向抗压试验和单桩复合地基抗压试验结果,表明粉喷桩加固吹填淤泥地基的效果明显,可供类似工程参考。Based on the reinforcement of dredged fill silt foundation in a coastal petrochemical area. On the original foundation treatment,four kinds of combination of cement injection piles with square spacing of 1. 2 m and 0. 9 m and cement content of 12% and 18% respectively are studied. The results of single pile vertical compression test and single pile composite foundation compression test are analyzed. The results show that cement injection piles have obvious effect on the reinforcement of dredged fill silt foundation. For reference of similar projects.

关 键 词:吹填淤泥地基 水泥粉喷桩 单桩竖向抗压试验 

分 类 号:TU471.8[建筑科学—结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象