作 者:任小亮 Ren Xiaoliang(POWERCHINA Northwest Engineering Corporation Limited, Xi’an 710065, China)
出 处:《山西建筑》2019年第16期83-84,共2页Shanxi Architecture
摘 要:抽水蓄能电站引水隧洞和地下厂房洞室群纵横交错,相互贯通,合理的施工通道布置可以有效避免施工干扰,降低施工强度,减少施工资源投入,实现均衡生产,低耗生产,确保地下厂房系统按照计划工期顺利实施。从抽水蓄能电站地下系统施工通道布置的原则、布置的方式及断面尺寸的选择几方面做了系统性的详细介绍,对抽水蓄能电站地下厂房系统施工通道布置与设计具有重要参考价值。The water diversion tunnel and underground powerhouse caverns of pumped storage power stations are criss-crossed and interconnected. Reasonable construction channel layout can effectively avoid construction interference, reduce construction intensity, reduce construction resource input, achieve balanced production, low-cost production, and ensure underground. The plant system was successfully implemented according to the planned construction period. This paper makes a systematic and detailed introduction from the principle of layout arrangement of underground system of pumped storage power station, the way of arrangement and the choice of section size. It has important reference value for the layout and design of the construction channel of underground powerhouse system of pumped storage power station.
分 类 号:TV743[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.31