检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:许正涛 XU Zheng-tao(Power China Hubei Elegtric Engineering Co.,Ltd.,Wuhan Hubei 430040)
机构地区:[1]湖北省电力勘测设计院有限公司,湖北武汉430040
出 处:《中国科技纵横》2019年第12期160-161,共2页China Science & Technology Overview
摘 要:为避免淮河洛河洼采砂船损伤1000kV淮南~南京淮河大跨越线路,本文通过采砂船现场测量、生产厂家调查、砂层勘测等方法,结合采砂需求,对洛河洼采砂船高度进行分析,确定淮河洛河洼1000kV大跨越线路对最高通航水位的净空高度取65m,近年的运行情况表明,未发生因采砂船逃窜导致的导线损伤事故。In order to avoid damage to 1000 kV Huainan-Nanjing Huai River Long Span Transmission Line caused by sand dredger in Luohe depression of Huai River, this paper analyses the height of sand dredger in Luohe depression by means of on-site measurement of sand dredger, investigation of manufacturer and survey of sand layer, combined with sand dredging demand, and determines that the clearance height of 1000 kV Long Span Transmission Line in Luohe depression of Huai River is 65m for the highest navigable water level, and its operation in recent years. The results show that there is no wire damage accident caused by the escape of sand dredger.
分 类 号:U697[交通运输工程—港口、海岸及近海工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117