检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:符蔚 王能 李志威[1,3] 胡旭跃[1,3] 沈小雄[1] FU Wei;WANG Neng;LI Zhi-wei;HU Xu-yue;SHEN Xiao-xiong(School of Hydraulic Engineering,Changsha University of Science & Technology,Changsha410114,China;Hunan Provincial Communications Planning,Survey & Design Institute Co.,Ltd.,Changsha410200,China;Key Laboratory of Water-Sediment Sciences and Water Disaster Prevention of Hunan Province,Changsha 410114,China)
机构地区:[1]长沙理工大学水利工程学院,长沙410114 [2]湖南省交通规划勘察设计院有限公司,长沙410200 [3]长沙理工大学水沙科学与水灾害防治湖南省重点实验室,长沙410114
出 处:《长江科学院院报》2019年第8期17-22,共6页Journal of Changjiang River Scientific Research Institute
基 金:国家自然科学基金项目(51709020);港口航道泥沙工程交通行业重点实验室开放基金(201806);长江科学院开放研究基金资助项目(CKWV2016369/KY)
摘 要:大洑潭枢纽位于沅水上游,处在山区限制性河道,其通航水流条件十分复杂,不利于通航。针对上、下游引航道口门区和连接段水流条件差、横流较大、洲尾通航困难及小流量下通航水深不足等问题,设计和修建大洑潭枢纽船闸整体物理模型,并结合船模航行试验,对船闸引航道口门区、连接段及洲尾处通航水流条件进行系统的试验研究。模型试验结果表明,船闸枢纽平面布置存在缺陷,上游船闸引航道口门区及连接段水流条件易受江心洲分汊口斜流影响,尤其左右两汊同时泄流下,船舶航行难度较大。整治方案采取加长导航墙和修建丁坝、顺坝及开挖航槽等措施进行试验研究,发现优化方案④下的通航、船模水流条件得到明显改善,确定了在该条件下的最大通航流量,并论证了在此方案下通航的安全性和工程可行性。Located in the upstream of the Yuanjiang River, Dafutan navigation-hydropower project is in mountainous restrictive channel with complex flow condition unfavorable for navigation. The entrance and connection segments of the upstream and downstream approach channels are featured with unfavorable flow condition, large transverse flow velocity, and insufficient water depth for navigation under low flow. In view of this, we designed and constructed a physical model of the shiplock of Dafutan project to comprehensively investigate the navigation flow condition in the entrance and connection segment of approach channel and the sandbar tail. Ship model test demonstrated that the original layout of the project and the navigation structures are unreasonable. The navigable flow condition of the entrance and connection segment of upstream lock approach channel is subjected to the cross current at the middle sandbar under the circumstance of simultaneous discharge of left and right branches, difficult for ship navigation. In order to improve the flow condition, we take measures such as elongating the navigation wall, building spur dike and longitudinal dike along the bar tail, and excavating the navigation channel. We found that the navigation condition and the flow condition of ship model had obviously improved under the optimized layout scheme 4. In addition, we determined the maximum navigable discharge under the optimized scheme 4, and demonstrated the safety and engineering feasibility of the optimization.
关 键 词:船闸 引航道 通航水力学 船舶航行 模型试验 大洑潭枢纽
分 类 号:TV149.2[水利工程—水力学及河流动力学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117