作 者:陈学焰 Chen Xueyan(SINOPEC Beihai Liquefied Natural Gas CO.,LTD,Beihai 536000)
机构地区:[1]中石化北海液化天然气有限责任公司,广西北海536000
出 处:《石化技术》2019年第7期31-31,16,共2页Petrochemical Industry Technology
摘 要:针对某3PE防腐层输气长输管道现场补口合格率仅为82%,远低于合同目标99%问题,从"人机料法环"方面进行分析,找出了剥离强度不足是合格率不足的症结点,经过现场反复实践、验证,结果表明:秋冬季节,按照高温型热收缩带出厂操作说明中"持续加热至130~150℃后10min,以指压法测试合格"后进行管道补口的方法施工,热收缩带剥离强度不达标,摸索到了最佳补火时间为25~30min,完善了高温型热收缩带施工作业指导书。Aiming at the problem that the qualified rate of field filling of a 3 PE anti-corrosion layer gas transmission pipeline is only 82%,which is far below the contract target of 99%,the"man-machine material method ring" is analyzed to find out the key point of insufficient qualified rate of peeling strength. After repeated field practice and verification,the results show that:Qiu dong season,according to the type of high temperature heat shrinkable belt factory operating instructions "for 10 minutes after heated to130-150 ℃,to test qualified" refers to the pressure pipeline repairing method after construction,heat shrinkable tape peel strength is not up to standard,grope for the optimal fire time for 25 to 30 minutes,to improve the high temperature heat shrinkable belt construction work instructions.
关 键 词:管道高温型热收缩带 现场补口 剥离强度 问题分析
分 类 号:TE988.2[石油与天然气工程—石油机械设备]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15