检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王庆 WANG Qing(Lingyuan Water Conservancy Engineering Quality Supervision Station, Lingyuan 122500, China)
机构地区:[1]凌源市水利工程质量监督站
出 处:《水利建设与管理》2019年第8期18-21,共4页Water Conservancy Construction and Management
摘 要:水电站过渡过程控制策略对水电站运行管理具有重要意义和价值,是减少水电站运行安全事故的重要工程技术手段。本文以辽宁省桓仁水电站为例,通过仿真计算提出以5s处为拐点,以20s为关闭总时长,并且在拐点处关闭40%的两段关闭规律为活动导叶关闭的最优规律,为桓仁水电站改善过渡过程质量提供依据,可供类似工程参考。The control strategy of hydropower station transition process has important significance and value for hydropower station operation management. It is an important engineering and technical means to reduce operation safety accidents of hydropower stations.Huanren Hydropower Station in Liaoning Province is adopted as an example in the paper. 5s is regarded as the inflection point through simulation calculation. 20s is regarded as the total closing time. The two-section closing law of closing 40% at the reflection point is regarded as the optimal law of closing the movable guide vane, thereby providing a basis for Huanren Hydropower Station to improve the quality of the transition process, and providing reference for similar projects.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.200