检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:任展 REN Zhan(Shenzhen Residential Engineering Management Station,Shenzhen,Guangdong 518043,China)
机构地区:[1]深圳市住宅工程管理站
出 处:《建筑施工》2019年第7期1192-1194,共3页Building Construction
摘 要:岩溶地区地下溶洞情况复杂多变,桩基施工特别困难,为谨慎起见,建设单位多采取超前钻探来排摸情况,并据此选择合适的施工工艺。在香港中文大学(深圳)一期项目的桩基施工中,遵循该项原则,较好地完成了桩基施工,桩基质量达到了预期效果,确保了工程的顺利实施。The underground karst caves in karst areas are complex and changeable,and pile foundation construction is particularly difficult.To be cautious,construction companies often adopt drilling in advance for exploration,and select appropriate construction technology accordingly.In the pile foundation construction of Phase I project of the Chinese University of Hong Kong(Shenzhen),such principle is properly followed and the pile foundation construction is well completed.The expected effect of the pile foundation quality is obtained and smooth implementation of the project is ensured.
分 类 号:TU753[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222