地下室超长剪力墙单面支模施工工艺  被引量:5

Construction Technology of Single-Side Supported Formwork for Basement Super-Long Shear Wall

在线阅读下载全文

作  者:高波 GAO Bo(S.C.G.Real Estate Co.,Ltd.,Shanghai 200080,China)

机构地区:[1]上海建工房产有限公司

出  处:《建筑施工》2019年第7期1271-1273,共3页Building Construction

摘  要:结合工程实际,在拟建地下室外墙不能满足双面支模施工的条件下,介绍一种单面受力模板支模体系,并总结了地下室剪力墙外侧的防水施工做法及内侧的支模工艺。通过严格的质量控制措施,保证了地下室外墙的施工质量。Combined with the engineering practice,under the condition that the proposed basement exterior wall does not meet the double-side supported formwork construction,a single-side supported formwork system is introduced.The waterproof construction practices on the outer side of basement shear wall and the formwork supporting technology for the inner side are summarized.Through strict quality control measures,the construction quality of basement exterior wall is guaranteed.

关 键 词:地下室剪力墙 结构施工 防水措施 单面支模 稳定性 

分 类 号:TU731[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象