作 者:陈文 CHEN Wen(Shanghai Construction No.2 (Group) Co.,Ltd.,Shanghai 200080,China;Shanghai Center of Top-Down Method in Construction Engineering,Shanghai 200080,China)
机构地区:[1]上海建工二建集团有限公司 [2]上海建筑工程逆作法工程技术研究中心
出 处:《建筑施工》2019年第7期1351-1353,共3页Building Construction
摘 要:以上海海昌极地海洋公园漂流型游乐设施中的回水系统建设项目为例,针对漂流回水系统管段直径大、管壁厚、吊装负荷高、焊接作业多、质量要求高等施工难点,介绍了埋地大直径回水管道的吊装设备选用、吊车站位布置、管段就位措施、管段的对口与焊接等工艺,以期为类似工程提供参考。Taking the construction project of backwater system in drifting type amusement facilities of Shanghai Haichang Polar Ocean Park as an example,aiming at the construction difficulties of large diameter pipe section,thick pipe wall,high hoisting load,many welding operations and high quality requirements in drifting type backwater system,the construction technology,such as the selection of hoisting equipment for buried large diameter backwater pipelines,the crane position layout,the measures for positioning pipe segment,the fitting and welding of pipe segment,etc.,are introduced,so as to provide reference for similar projects.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.119.103.40