检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:乔剑华[1] 张剑[1] 武守元[1] Qiao Jianhua;Zhang Jian;Wu Shouyuan(CCCC First Harbor Consultants Co.,Ltd.,Tianjin 300222,China)
机构地区:[1]中交第一航务工程勘察设计院有限公司
出 处:《港工技术》2019年第4期46-49,共4页Port Engineering Technology
摘 要:本文介绍了天津港大港港区泰奥石化码头工程采用的设计方案、工艺平面布置、特殊货种的装卸设施设计等,并在此工程中首次进行了软管架设计、管道清管转换器设计,以提高码头机械化程度、节省工程投资、增加工艺系统灵活性、提升码头安全环保性能,经过几年的生产运营,应用效果较好。通过对本工程中工艺设计经验的总结,可供同类工程参考和借鉴。Tai'ao Petrochemical Terminal at Dagang harbor of Tianjin Port is characterized with a large number of berths,a wide variety of cargos,great difference in physical properties and higher requirements for technological system by the investors.In view of the above characteristics,the adopted design plan,the plane layout of handling process and the design of handling facilities for special cargos are introduced in detail.In addition,the design of hose frame and pipe-cleaning converter firstly applies to this project in order to improve the mechanization level of the terminal,save the investment,increase the flexibility of technological system and enhance the safety and environmental protection performance of the terminal.The design application has achieved good operation effect in recent years.The experience in technological design accumulated in this project is summarized,which will serve as a reference for similar projects.
分 类 号:U693.31[交通运输工程—港口、海岸及近海工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15