检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张国辉 ZHANG Guohui(Shanxi Xinjing Coal Mine Co., Ltd. , Yangquan 045000 , China)
机构地区:[1]山西新景矿煤业有限责任公司
出 处:《煤矿现代化》2019年第6期189-192,共4页Coal Mine Modernization
摘 要:为保证6118工作面运输顺槽沿空留巷时巷道围岩的稳定,运用理论分析结合现场实测的方法,对深井沿空留巷巷旁支护阻力进行具体分析,并结合6118工作面地质条件对沿空留巷的支护方案进行具体设计,并通过矿压监测对沿空留巷的支护方案进行验证分析。结果表明:支护方案实施后,6118运输顺槽顶板的最大下沉量为600mm,两帮的移进量为340mm,保证了沿空留巷围岩的稳定。In order to ensure the stability of the surrounding rock of the roadway when the 6118 working face is transported along the goaf, the theoretical analysis and the field measurement method are used to analyze the supporting resistance of the roadway along the deep roadway,and the geological conditions of the 6118 working face are combined. The specific design of the support scheme along the empty roadway is carried out, and the support scheme of the roadway along the goaf is verified and analyzed through the mine pressure monitoring. The results show that after the implementation of the support scheme, the maximum sinking amount of the 6118 transporting trough top plate is 600 mm,and the displacement of the two gangs is 340 mm, which ensures the stability of the surrounding rock in the retaining lane along the empty road.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145