胶凝砂砾石坝坝体冬季保温与排水技术  

On Heat Preservation and Drainage Technique in Winter Season for the Dam Body of the Cemented Sand Gravel and Rock Dam

在线阅读下载全文

作  者:薛秀清 XUE Xiu-qing

机构地区:[1]山西省水利建筑工程局有限公司

出  处:《山西水利科技》2019年第3期13-14,35,共3页Shanxi Hydrotechnics

摘  要:守口堡水库地处北方高寒地区,气温低、风大、雪多,工程冬歇时间长,为胶凝砂砾石坝能否在北方地区成功应用提出了难题。文中结合工程进度、成本、质量等因素,详细论述了在胶凝砂砾石坝施工期间的三个冬季,采用蓄水、覆盖等不同保温措施及相应的排水方案,为胶凝砂砾石坝成功越冬提供了经验。The Shoukoubu Reservoir was located in the northern region of China with low temperature,large wind and heavily snow. The construction period of the project had a long stoppage in winter,which cause a problem whether the cemented sand gravel and rock dam can be successfully applied in the north area. Combining with the construction process,cost,quality and other factors,this article provided several successful construction experience for the safety of the dam during three winter periods,like using some different heat preservation measures such as water storage and covering and corressponding foundation pit drainage scheme.

关 键 词:胶凝砂砾石坝 蓄水保温 覆盖保温 基坑排水 

分 类 号:TV64[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象