松辽盆地基岩水平风险探井钻井优化设计与应用  被引量:5

Drilling optimization design and application of bedrock risk exploration horizontal wells in Songliao Basin

在线阅读下载全文

作  者:孙妍[1] SUN Yan(Drilling Engineering Technology Research Institute of CNPC Daqing Drilling Exploration Engineering Corporation y Daqing Heilongjiang 163413,China)

机构地区:[1]大庆钻探工程公司钻井工程技术研究院

出  处:《探矿工程(岩土钻掘工程)》2019年第8期83-88,共6页Exploration Engineering:Rock & Soil Drilling and Tunneling

摘  要:为了保证松辽盆地首口基岩水平风险探井安全钻进、缩短施工周期,开展了井眼轨道、井身结构、钻井提速、复杂事故预防等优化设计,建立了不同开次套管抗内压强度计算方法,确定了有针对性的技术措施。通过地震剖面连线,确定了地质靶点,根据邻井实钻统计,12in井眼设计采用1.5°螺杆,造斜率控制在(5°~7°)/30 m,设计了井眼轨道。基于气体与流体压缩系数的不同,研究了不同开次套管抗内压强度,发现生产套管井底是抗内压薄弱点,而其它开次套管抗内压薄弱点则是井口处。在井震结合的地质预测基础上,采用复合钻头、强化钻井参数等措施,比邻井钻速提高13.38%,采用复合堵漏技术,配套施工工艺,累计减少钻井液漏失247 m^3。通过上述技术的研究与应用,隆平1井钻井周期同比隆探2井缩短21.16 d,从而为松辽盆地基岩风化壳勘探开发提供了技术支撑,为以后同类井的实施提供了依据。In order to ensure safe drilling and shorten the drilling period of the first bedrock risk exploration horizontal well in Songliao Basin, optimum design of the borehole trajectory, casing program, drilling speed increase and prevention of complex incidents were carried out, calculation methods of internal compressive strength of casing at different well sections were established, and effective technical measures were determined. Geological targets were determined through the seismic profile. According to the statistics of actual drilling in the adjacent wells where 1.5° motor was used in the well drilling design, and the build rate was controlled at(5°~7°)/30 m, the borehole trajectory was accordingly designed. Based on the difference in compressibility coefficients of gas and fluid, the compressive strength of casings with different spud was studied, and it was found that the bottom of production casing was the weak point, while for the other casing the weak point was at the wellhead. On the basis of geological prediction, the drilling speed was increased by 13.38% over adjacent wells by adopting the composite bit and strengthening drilling parameters, and circulation loss was reduced by 247 m^3 by using compound plugging technology and complete process. Through the research and application of the above technology, the drilling time of Well Longping-1 was shortened by 21.16 days compared with the adjacent wells, which provides technical support for the exploration and development of bedrock weathered crust in Songliao Basin and provides a basis for the implementation of similar wells in the future.

关 键 词:S形定向井 井眼轨道 钻井提速 强化钻井参数 复合堵漏 松辽盆地 

分 类 号:TE243[石油与天然气工程—油气井工程] P634[天文地球—地质矿产勘探]

 