TBM出碴斜井及斜井翻碴施工技术  被引量:4

Construction Technology of TBM Ballast Removal Inclined Shaft and Ballast Turning in Inclined Shaft

在线阅读下载全文

作  者:韩明 HAN Ming(China Railway Tunnel Group Sanchu Co.Ltd.,Shenzhen 518000,China)

机构地区:[1]中铁隧道局集团三处有限公司

出  处:《工程建设与设计》2019年第17期244-246,共3页Construction & Design for Engineering

摘  要:以深圳地铁10号线1011-3标孖岭站-雅宝站双护盾TBM区间施工为例,介绍了出碴斜井及斜井翻碴在地铁施工中的运用,解决了施工场地狭小,制约施工生产进度的问题,可供同类地铁施工工程参考。This paper takes the construction of double shield TBM section between the 1011-3 Maling station to Yabao station in Shenzhen metro line 10 as an example, and introduces the application of ballast removal inclined shaft and ballast turning in inclined shaft in metro construction, which solves the problems of narrow construction site and restriction of construction production progress, and provides reference for similar metro construction projects.

关 键 词:地铁 双护盾TBM 出碴斜井 斜井翻碴 

分 类 号:U231.3[交通运输工程—道路与铁道工程] U455.92[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象