粉砂地基上水闸防渗设计案例分析  被引量:2

在线阅读下载全文

作  者:陈格君 管玲玉 

机构地区:[1]中国电建集团华东勘测设计研究院有限公司

出  处:《科技创新与应用》2019年第29期96-97,共2页Technology Innovation and Application

摘  要:下沙地区的地基土中含有较厚的粉砂层,且场地周边有鱼塘,需做好充分的防渗措施。本案经地质勘探后运用改进阻力系数法对三号大堤北闸进行渗流稳定计算,选取高压旋喷桩提高防渗能力。水闸建成后通过位移监测对防渗效果进行分析,并对暗塘部位采取防渗补强措施。The foundation soil in Xiasha area contains thick silt layer, and there are fish ponds around the site, so it is necessary to take adequate anti-seepage measures. In this case, after geological exploration, the improved resistance coefficient method is used to calculate the seepage stability of the north sluice of No. 3 embankment, and the high pressure rotary jet grouting pile is selected to improve the anti-seepage ability. After the completion of the sluice, the anti-seepage effect is analyzed by displacement monitoring, and the anti-seepage and reinforcement measures are taken to the hidden pond.

关 键 词:渗漏 水闸 改进阻力系数法 高压旋喷桩 

分 类 号:TV66[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象