检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张艳[1] 陈洪根 闫鑫 张国辉 王国东 Zhang Yan;Chen Honggen;Yan Xin;Zhang Guohui;Wang Guodong(School of Business Administration,Zhengzhou University of Aeronautics,Zhengzhou 450046,China;School of Management Engineering,Zhengzhou University of Aeronautics,Zhengzhou 450046,China)
机构地区:[1]郑州航空工业管理学院工商管理学院,郑州450046 [2]郑州航空工业管理学院管理工程学院,郑州450046
出 处:《现代制造工程》2019年第9期124-131,共8页Modern Manufacturing Engineering
基 金:国家自然科学基金项目(U1404702);航空科学基金项目(2017ZG55029);教育部人文社科项目(18YJAZH125,17YJC630151,17YJC630124);河南省教育厅人文社会科学研究项目(2018-ZZJH-597,2019-ZDJH-063);河南省科技厅科技攻关项目(182102210448);河南省科技创新杰出青年基金项目(184100510001)
摘 要:针对设备异常将导致过程质量方差发生漂移的可修系统,提出了一种考虑延迟监测的预防维修和EWMA方差控制图联合决策模型。首先分析确定了预防维修和过程质量监控联合决策生产系统在延迟监测条件下形成的6种更新策略;然后基于每个抽样间隔期的分析思路,建立了每种更新策略的期望周期和成本,并根据更新过程理论构建了联合优化延迟监测期、预防维修规划周期及EWMA方差控制图参数(样本量、抽样间隔、控制线系数及平滑系数)以实现单位时间期望总成本最小的经济决策模型。实例分析表明,模型由于充分考虑了延迟监测问题,能够获得比不考虑延迟监测模型更优经济效益的决策结果。A joint decision-making approach to preventive maintenance and Exponentially Weighted Moving Average ( EWMA) chart for monitoring process variance was developed. The proposal of delayed monitoring policy postponed the sampling process till a scheduled time and contributed to six renewal scenarios of the production process, where downtime was triggered by scheduled preventive maintenance period or the alert of EWMA chart proposed to monitoring the shift of process variance resulted by fault. The cycle cost and the cycle time of each scenario were obtained by integral calculation based on the analysis of each sampling interval. Therefore, a mathematical model was given to minimize the expected cost per unit time by optimizing values of six variables (scheduled duration without monitoring, scheduled preventive maintenance period, sample size, sampling interval, control limit and smoothing parameter). The results of a case indicate that the hourly cost of the proposed model is lower than that of the previous method used in the enterprise where delayed monitoring was not considered.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38