三峡工程175米试验性蓄水运行期的泥沙观测分析  被引量:2

Analysis of Sediment Observation Data in the Trial Impounding Period of the Three Gorges Project to Pool Level of El. 175-meter

在线阅读下载全文

作  者:郑守仁[1] Zheng Shouren(Changjiang Water Resources Commission,Ministry of Water Resources,Wuhan 430010,China)

机构地区:[1]水利部长江水利委员会

出  处:《长江技术经济》2019年第3期1-7,共7页Technology and Economy of Changjiang

摘  要:自2008年起,三峡工程由初期蓄水位156.0m运行转入正常蓄水位175m试验性运行。本文分析归纳了三峡工程175米试验性蓄水运行期的泥沙观测资料,从长江上游水文情势变化、水库实测泥沙淤积资料分析、坝区实测泥沙资料分析、大坝下游河道冲淤资料分析四个方面进行归纳,得出了相关结论。Since 2008,the Three Gorges Project Reservoir has been on a transition from the initial pool level of El 156.0 m to the normal pool level of El. 175 m for trial operation purpose. This paper analyzes the sediment observation data in the trial impounding period of the Three Gorges Project to pool level of El. 175-meter. Four aspects are analyzed including hydrological situation change in the upper reaches of the Yangtze River,the analysis of sedimentation data in the reservoir,the analysis of sediment data in the dam area,and the scouring and silting data of the downstream dam.

关 键 词:水库 泥沙观测 三峡工程 

分 类 号:TV698.1[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象