检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:侯建军 HOU Jianjun(Shanghai Construction Group Co., Ltd., Shanghai 200080, China)
机构地区:[1]上海建工集团股份有限公司
出 处:《建筑施工》2019年第9期1643-1645,共3页Building Construction
摘 要:针对复杂劲性混凝土梁柱节点这一逆作法施工中的难点问题,结合工程实例,从前期模拟、施工工艺和质量控制等方面进行了研究。在对比分析了梁柱节点的几种连接形式后,对薄弱环节增加了施工措施,取得了不错的效果,相关经验对于其他逆作深基坑项目有一定的借鉴意义。In view of the difficult problems of complex stiff concrete beam-column joints in reverse construction, combined with engineering examples, it is studied from the aspects of pre-simulation, construction technology and quality control. After comparing and analyzing several connection forms of beam-column joints, construction measures are added to weak areas, and good results have been achieved. The relevant experience has certain reference significance for other reverse deep foundation pit projects.
分 类 号:TU755[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28