作 者:姜海莹[1,2] JIANG Haiying(Xi'an University of Architecture and Technology, Xi'an, Shaanxi 710055, China;Henan College of Transportation, Zhengzhou, Henan 450052, China)
机构地区:[1]西安建筑科技大学 [2]河南交通职业技术学院
出 处:《建筑施工》2019年第9期1764-1769,共6页Building Construction
摘 要:关键链项目管理法是一项全新的工程项目进度管理方法。通过对已有文献进行的总结与梳理,从关键链的识别与调度、缓冲设置影响因素、缓冲尺寸与设置、缓冲监控四个方面对关键链项目管理法研究的核心内容进行阐述与分类,并提出下一步的研究方向,为关键链项目管理法的理论基础和实践应用提供参考。Critical Chain Project Management (CCPM) is a new project progress management method.By summarizing and sorting out the existing literature, the core content of the critical chain project management method is expounded and classified from four aspects: identification and scheduling of critical chain, influencing factors of buffer setting, buffer size and setting, and buffer monitoring and the further research direction is put forward to provide a reference for the theoretical basis and practical application of the critical chain project management method.
分 类 号:TU71[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145