检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:孙洪亮 陈益民 杨飞 侯博 Sun Hongliang;Chen Yimin;Yang Fei;Hou Bo
出 处:《中国水利》2019年第18期80-83,共4页China Water Resources
摘 要:白鹤滩水电站尾水隧洞末端部分洞段由导流洞改建而成,尾水位较低时,存在明满流现象,对输水系统安全有重要影响。本文采用模型试验方法,对明满流段的流态及体型优化进行研究。结果表明:过渡过程中,尾水洞内正反向水流相叠加,产生水面涌波,触顶后形成眀满流,并伴随压力脉动现象。脉动压力的极值远小于隧洞衬砌压力的设计值73.5 m,对尾水隧洞衬砌段结构影响较小。结构优化研究表明在尾水隧洞出口设置逆坡堰及优化衔接段坡度,可有效改善明满流流态。The end part of Baihetan hydropower station tailrace tunnel is reconstructed from diversion tunnel.When the tailrace water level is low,there exists free-surface-pressurized flow phenomenon,which has an important impact on the safety of water conveyance system.In this paper,the model test method is used to study the flow characteristic and structure optimization of the free-surface-pressurized tailrace tunnel.The results show that during the transition process,the forward and reverse water flows in tailrace tunnel are superimposed,resulting in a water surface surge wave,which forms free-surface-pressurized flow after the surge wave touching the tunnel top,accompanied by pressure pulsation.The extreme value of pressure pulsation is much less than the design value of tunnel lining pressure of 73.5 meters,which has little influence on the structure of tailrace tunnel lining section.Structural optimization study shows that the free-surface-pressurized flow regime can be effectively improved by setting up inverse slope weir at the outlet of tailrace tunnel and optimizing the gradient of the connecting section.
关 键 词:白鹤滩水电站 尾水隧洞 明满流 模型试验 结构优化
分 类 号:TV7[水利工程—水利水电工程] TV134.3
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.185