地基加固过程中沉降监测点上升的原因分析  

Cause Analysis of Settlement Monitoring Point Rising During Foundation Reinforcement

在线阅读下载全文

作  者:王艳平 方力强 牛寅[1] 郭勇 WANG Yanping;FANG Liqiang;NIU Yin;GUO Yong(National Center for Quality Supervision and Test of Building Engineering,Beijing 100013,China)

机构地区:[1]国家建筑工程质量监督检验中心

出  处:《工程质量》2019年第9期58-60,共3页Construction Quality

摘  要:沉降观测中,有时会出现沉降监测点标高上升的情况。关于测点标高上升的原因,目前尚无明确的解释。结合某工程地基加固过程中沉降监测实例,分析基准点下沉、测量误差、地基土扰动、地下水位变化等原因对沉降监测点标高上升的影响,为沉降监测工作中此类问题的解决提供参考。In settlement observation,elevation rise of settlement monitoring points sometimes occurs. There is no clear explanation for the reason of elevation rise of observation points. This paper analyzes the influence of base-point subsidence,measurement error,foundation soil disturbance,groundwater level change and other factors on the elevation rise of the subsidence monitoring point in combination with the subsidence monitoring example in the process of foundation reinforcement of a project,and provides a reference for the settlement monitoring.

关 键 词:沉降监测 标高 上升 原因分析 

分 类 号:TU753.8[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象