检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:邓剑 白峰振 杨猛 何林纳 雷涛[1] DENG Jian;BAI Feng-zhen;YANG Meng;HE Lin-na;LEI Tao(China Construction Second Engineering Bureau Ltd.,100010,Beijing,China)
机构地区:[1]中国建筑第二工程局有限公司
出 处:《建筑技术》2019年第10期1175-1177,共3页Architecture Technology
摘 要:昆明景成大厦项目基坑施工中,针对软土区土层分布的人工填土、粉质粘土、粉土、泥质碳土有不规律互层、夹层现象且地下水丰富,水量大等施工难点,采用钢管土钉+喷锚与桩锚结合的支护方案解决桩顶位移大的问题,降低了工程成本.During foundation pit construction of Kunming Jingcheng Building project, some construction difficulties were encountered, such as irregular interbedding and interlining of artificial backfilled soil, silty clay, muddy soil and muddy carbon soil, abundant groundwater and big water flow, etc. Therefore, steel tube soil nail, spray anchor and pile anchor combined support scheme was adopted to solve the pile cap displacement and reduce the construction cost.
分 类 号:TU758.11[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222