检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张瑜[1] 邓林峰[1] 杨猛 胡林 芦晓龙 ZHANG Yu;DENG Lin-feng;YANG Meng;HU Lin;LU Xiao-long(China Construction Second Engineering Bureau Ltd.,100010,Beijing,China)
机构地区:[1]中国建筑第二工程局有限公司
出 处:《建筑技术》2019年第10期1213-1215,共3页Architecture Technology
摘 要:昆明春之眼商业中心施工中,针对业主分三期开发对施工节奏的影响,经研究决定采用PVC管柱替代后浇带架体作为临时支撑体系,节约了施工成本,解决了因分期开发带来的钢管柱件租赁费用高昂问题.During construction of Kunming Chunzhiyan (Eye of Spring) Commercial Center project, the owner planned to develop the project in three phases, but it may influence the construction schedule. After study, it was determined to replace the post-pouring belt frame with PVC pipe column, which was used as temporary support system, not only saving the construction cost, but also solving the high lease expense of steel pipe column in multi-phase development.
分 类 号:TU745.3[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117