受限场地内近距离双立井井筒凿井施工设施布置设计  被引量:1

Layout Design of Construction Facilities for Shaft Sinking of Two Mine Shafts with Closed Distance in Limited Site

在线阅读下载全文

作  者:王改侠 贾振刚[1] 苗峰峰 王艳 WANG Gaixia;JIA Zhengang;MIAO Fengfeng;WANG Yan(No.49 Engineering Division,China Coal No.1 Construction Company limited,Handan 056003,China)

机构地区:[1]中煤第一建设有限公司第四十九工程处

出  处:《建井技术》2019年第3期27-30,共4页Mine Construction Technology

摘  要:立井井筒施工生产临建设施布置是凿井施工组织设计工作的重要内容;要保证凿井设施、设备在井筒断面内布置合理,与井筒施工、生产能力匹配合理,与井巷二期工程衔接有序。而要实现这一要求,必须结合场地条件、场地永久设施布置进行设计。结合工程实例,对受限场地条件下的双立井井筒凿井施工设计问题提出了解决办法,可供类似工程参考。A layout of the temporary construction facilities for the construction and production of the mine shaft would be the important contents of the design work for the construction and organization of the mine shaft sinking.In order to ensure a rational layout of the mine shaft sinking facility and equipment in the cross section of the mine shaft,the mine shaft construction and the mine production capacity should be rationally matched and should be in a sequent connection with the second phase of the mine shaft.To realize the requirement,the design should be conducted with the site conditions,site permanent facility layout.In combination with the engineering cases,a solution was provided to the construction design issue of the two mine shaft sinking under the limited site condition and could provide the references to the similar engineering.

关 键 词:受限场地 立井井筒 设施布置 有序衔接 

分 类 号:TD214.4[矿业工程—矿井建设]

 