检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:鲁思远 龙伟 管志保 LU Si-Yuan;LONG Wei;GUAN Zhi-Bao(Guizhou Survey and Design Research Institute for WaterResources and Hydropower, Guiyang 550002, China)
机构地区:[1]贵州省水利水电勘测设计研究院
出 处:《水利科技与经济》2019年第9期89-92,共4页Water Conservancy Science and Technology and Economy
摘 要:水利工程枢纽建筑物结构型式多样,采用传统二维设计,出图工作量大且无法直观地将复杂建筑物表达出来,目前三维设计已广泛应用于水利工程中。针对枢纽建筑物泄洪洞进水塔进行了全过程的三维设计应用。实践表明,三维设计可有效提高设计效率和质量,是一种更为高效、直观的设计方法。The structure of the water conservancy Projects has various types, and the traditional2-D design has a large amount of work and cannot express the complex buildings intuitively. 3-D design has been widely used in water conservancy projects. This paper has carried out the 3-D design and application of the whole process of the spillway tunnel intake tower of the hub building. Practice shows that 3D design can effectively improve design efficiency and quality, and is a more efficient and intuitive design method.
分 类 号:TP39[自动化与计算机技术—计算机应用技术] TV65[自动化与计算机技术—计算机科学与技术]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.170