检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张树伟 胡树军 董秀艳 Zhang Shuwei;Hu Shujun;Dong Xiuyan(HBIS Group Mining Co., Ltd., Tangshan, Hebei, 063000)
机构地区:[1]河钢集团矿业公司
出 处:《河北冶金》2019年第10期16-21,共6页Hebei Metallurgy
摘 要:采用动力有限元方法,利用ANSYS/LS-DYNA软件建立了无减震带和有减震带的爆破地震效应的数值模型,研究了质点振动速度与爆破应力波的变化,分析了减震带对台阶爆破地震效应的影响。结果表明,质点振动速度随着爆心距的增加而减小,但有减震带的原点振幅较小,振幅平均降低84%;应力波传播过程中,从减震带的底部绕射,减震带对地震波有阻隔延迟作用,可将其应用到露天爆破工程。Using dynamic finite element method and ANSYS/LS-DYNA software, a numerical model of blasting seismic effect with and without shock absorption zone is established. The variation of particle vibration velocity and blasting stress wave is studied, and the influence of shock absorption zone on the seismic effect of bench blasting is analyzed. The results show that the particle vibration velocity decreases with the increasing of the blasting center distance, but the amplitude of origin with shock absorption belt is small and the amplitude decreases by 84%. The Stress wave is diffracted from the bottom of the shock absorption zone during its propagation, and the damping band has a delayed effect on the seismic wave, so it can be applied to the open blasting project.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.166