检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:曹辉 CAO Hui(Shuohuang Railway Locomotive Branch,Suning Hebei 062350)
机构地区:[1]朔黄铁路机辆分公司
出 处:《河南科技》2019年第22期109-110,共2页Henan Science and Technology
摘 要:国家能源集团成立,重载列车开行,朔黄铁路2017年和2018年运量连续突破3亿吨。重载列车开行后列车长度增加,过分相又是主从车分别控制,主从车之间距离大约1300m,传输距离的增大使信号传输不够稳定,增加了主从车过分相的难度。本文根据两万吨重载列车的特性和朔黄铁路线路特点,分析总结过分相的操纵办法和注意事项。With the establishment of the State Energy Group and the operation of heavy haul trains, the Shuohuang Railway has continuously exceeded 300 million tons in 2017 and 2018. After Heavy-haul Train running, the train length increases, and the overlapping phase is controlled by the master-slave vehicle separately. The distance be. tween the master-slave vehicle and the slave vehicle is about 1 300 m. The increase of the transmission distance makes the signal transmission unstable, which increases the difficulty of the master-slave vehicle passing through the phase. According to the characteristics of 20,000 tons heavy haul train and Shuohuang railway line, this paper ana. lyzed and summarized the operation methods and precautions of over-phase.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38