检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:薛高明 XUE Gao-ming(Xinjiang Tianshan Mining Co., Ltd., Xu Mine Group, Kuqa, Xinjiang, 842000)
机构地区:[1]徐矿集团新疆天山矿业有限责任公司
出 处:《煤炭科技》2019年第5期76-78,共3页Coal Science & Technology Magazine
摘 要:天山矿业公司俄霍布拉克煤矿产能由原来的0.4Mt/a提高至0.75Mt/a,需对南主井带式输送机的胶带进行更换,针对工期紧、胶带质量重、危险性大的特点,采用机头带动法和自制千斤顶夹具等施工工艺,安全高效地完成了更换胶带的任务。The production capacity of Ohobrak Coal Mine of Tianshan Mining Company has been increased from 0.4 Mt/a to 0.75 Mt/a. It is necessary to replace the belt of the belt conveyor in the south main shaft. In view of the characteristics of tight construction period, heavy belt quality and great danger, the construction technology of head driving method and self-made jack clamp have been adopted to replace the belt safely and efficiently.The task of replacing conveyor belt was finished safely and efficiently.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.134.105.118