检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘显军[1] 冉鹏[1] LIU Xianjun;RAN Peng(First Branch of Sinohydro Bureau 7 Co., LTD, Chengdu, Sichuan, 610036)
出 处:《四川水力发电》2019年第5期1-3,18,共4页Sichuan Hydropower
摘 要:BIM(建筑信息化模型)即利用数字模型对项目进行设计、施工、运营管理的过程,它能够将工程建设项目在各个不同阶段的工程信息、施工过程和资源集成在一个模型中,将传统枯燥的数据以及平面进度转化为更为形像、更方便的3D图像。BIM技术一经问世,便迅速被各种工程的参与方认可并开始推广应用。阐述了BIM技术在铁路工程施工中的应用情况。BIM (Building Informatization Model) is the process of designing, construction and operation management of a project by using digital model, which can integrate engineering information, construction process and resources at different stages of a project into one model, and transform traditional dull data and plane progress into more visual and more convenient 3D images. Once BIM technology came out, it was quickly accepted by the participants in various projects and began to be popularized and applied. This paper expounds the application of BIM technology in railway engineering construction.
分 类 号:U21[交通运输工程—道路与铁道工程] U215
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222