作 者:杨瑞英 田艳军 YANG Ruiying;TIAN Yanjun(Third Branch of Sinohydro Bureau 10 Co., LTD, Chengdu, Sichuan, 610072)
出 处:《四川水力发电》2019年第5期90-94,共5页Sichuan Hydropower
摘 要:大断面软弱围岩采用普通台阶法开挖若支护不及时拱部容易出现垮塌现象,从而导致施工进度缓慢,质量和安全难以得到保障。因此,隧道开挖施工必须采取合理的施工方法对质量、安全、进度进行控制。以杨柳垭隧道工程为例,介绍了大断面软弱围岩采用环形开挖预留核心土法的施工工艺、施工参数以及施工措施,有效地对隧道开挖各个环节进行控制,取得了较好的效果。If the support is not timely during large section weak surrounding rock excavation when applying normal bench cut method, the arch will collapse easily, which leads to slow of construction progress and difficult to guarantee quality and safety. Therefore, reasonable construction methods must be adopted to control the quality, safety and progress of tunnel excavation. Taking Yangliuya Tunnel Project as an example, this paper introduces the construction technology, construction parameters and construction measures of ring excavation with core soil reserved method for large section weak surrounding rock excavation, which effectively controls all processes of tunnel excavation and achieves good results.
分 类 号:TU941[建筑科学—建筑技术科学] TU745.3
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.145.86.137